The Great Frame Up

Here are a few photos of the wall and roof framing.  My wife and I did all of this in a weekend and it turned out great.  We used local Poplar from the local sawmill for the walls and resorted to the local lumberyard for the roof framing (SPF).  

You’ll notice a few design differences in the wall, compared to standard framing,  due to this being a board and batten sided building.  The most noticeable is the spacing on the vertical members and the addition of horizontal members which will serve as nailers/supports for the BnB.   We also used a few 4×4 posts in lieu of 2x4s in the walls just for extra structural  integrity.  Where we had a 6×6 in the foundation we placed a 4×4 in the wall above it in order to help transfer the weight more evenly.  This is my engineering side coming out.  

Photo Nov 05, 10 36 50 AM.jpg

Long walls framed up and ready to stand.  These are 24 foot walls and the two of us lifted them into place fairly easily in 12 foot sections.  

Photo Nov 05, 1 18 12 PM.jpg

Back wall raised and nailed down.  As MaryAnn (my wife) held the wall vertical, I verified the wall was on the chalk line then nailed the bottom plate down.  Once the bottom plate was secure we checked plumb and nailed in the temporary diagonal bracing to hold it in place.  You can see the window opening framed here.  

Photo Nov 05, 1 18 15 PM.jpg

Second half of the back wall nailed in plumb and square.  The large framed opening is for a five foot wide doorway.   

Photo Nov 05, 4 25 47 PM.jpg

Sawing and framing the end walls.  There are no openings in these two walls so it is a straight forward frame up.  The gable ends also have less force on them than the long walls.  We still chose to place a 4×4 in the center over the 6×6 used in the foundation.

Photo Nov 05, 4 33 41 PM.jpg

Pneumatic nailers make life much easier.

Photo Nov 05, 4 34 12 PM.jpg

However, like man’s best friend, a trusty hammer can never fully be replaced.

14939515_949229981888016_8024179645982859628_o.jpg

The sun has set on this day of wall framing and raising.  It is a satisfying accomplishment to come this far in such a handwork project.  

Pro tip:  Before attempting to raise a wall, toenail a couple of 8d or 10d nails through the bottom plate into the floor.  This will aid in holding the bottom of the wall in place, at the chalk line, and the nails will pull out as you raise the wall.  

Bonus tip:  Here is a drawing I did in AutoCAD (of our back wall) to illustrate the basic wall framing members.  I hope this helps. 

Wall Framing.jpg

 

 

Advertisements

Stanley 246

s-l1600.jpg

I finally picked up a Stanley 246 miter box at a steal of a price.  I have been looking for one of these for quite some time to use when I’m working strictly with hand tools or when I need something with extreme precision.  The 246 is coveted by hand tool woodworkers because of it’s accuracy, durability, and smooth action.  I am somewhat torn between “restoring” this tool or leaving as is and just tuning it and using it.  I really like the patina it has accumulated over the years so for now I may just leave it.  

Pro tip: If you are going to use any type of hand saw for woodworking, learn how to sharpen a hand saw.  A sharp saw is a must for quality work and will make the task pleasurable rather than deplorable.  

s-l1600 (2).jpg

Everything on the miter box is beautiful and functional.

s-l1600 (3).jpg

Quality parts come together to make a quality tool.

s-l1600 (1).jpg

A view from the underside.  I can barely wait to use this in the Lincoln Knobs Shop.

Stay tuned for updates on the miter box, putting it to use, and how to sharpen and set saw teeth.

New Shop Update

Well, it has been a busy few weeks here at Lincoln Knobs Woodworking.  The shop is just about ready to be under roof (we will do that this weekend) but to catch you up here are a few photos.

14608660_938675176276830_7818438800225586145_o.jpg

Half of the floor joists are down.  We went with 2×8 SPF to span the 10′ distance, times two for 20′ total.

14856056_938675179610163_8217802720190438327_o.jpg

In my opinion the Dewalt Miter Saw is one of the best power tools on the market.

14556598_938675246276823_7346741286832082143_o.jpg

Perfectly level, just what we were looking for.

14753771_938675256276822_5670035811637963438_o.jpg

All joists down and ready for some subfloor.

14853233_944095689068112_1666445766914723096_o.jpg

We chose OSB for the subfloor.

14876705_944095735734774_5969493204675436166_o.jpg

All subfloor nailed down and ready for the oak floor. It is very important that you have maintained everything square.  If you are out just a little it’ll probably be ok but more than a little will give you headaches as you progress.

14856088_944095845734763_7730293737993480474_o.jpg

We used 1×6 oak fence plank boards planed down for the flooring.  It has a beautiful texture and grain.  It isn’t perfect, so if you are looking for that Frank Lloyd Wright perfection, choose another option.

14902880_944095885734759_5548877809688648321_o.jpg

When the poly is applied the character will really pop in this flooring.

So, we have gotten more than this done at this point but I’ll leave it here for now.  Look for walls and roof framing next.  It has been quite a blast building this shop with my wife.  We work together great and she never quits.

Pro tip:  Take your time.  Building something like this doesn’t happen overnight, or even over a weekend.  It’s best to go slow and get it right than fast and end up with slop.  I plan for this building to stand long after I am gone.

Industrial Stool Design

img_6764

I am brainstorming a new tripod stool design.  I am really liking the idea of something industrial looking with a concrete and wood style. I am considering using some sort of hex head screw in lieu of the pegs at the mortise and tenon.  I think these would accent the industrial look and bring out the bolt heads underneath the concrete seat.  

Posts and Beams

We were able to set the posts and beams over the weekend on the new shop.  This wasn’t a very daunting task but highly important to get level, plumb, and square.  The foundation is where it all starts and if you have miscalculations here they will become increasingly evident as work progresses.  We used several methods to check ourselves; water level, board and 4′ level, plumb bob, measuring diagonals, and string line.  It took some manipulation but we ended up true.

Photo Oct 15, 4 56 39 PM.jpg

First two short posts in and first beam set.  The back of the building has the highest ground elevation thus the shortest posts.  This is where it all begins.  (notice we are using a generator for temporary power.)

Photo Oct 15, 5 58 46 PM.jpg

All posts and beams for the back of the shop are set.  You can see the 4′ level which thankfully was good to go.

Photo Oct 15, 7 17 03 PM.jpg

Middle set of posts and beams started.  Things were a little more difficult to get aligned here but it worked out.

Photo Oct 15, 7 10 38 PM.jpg

One of my favorite tools, the Dewalt Sliding Compound Miter Saw.  We are also using a 1/2″ drill to power through the treated 6x6s with a 5/8″ woodboring bit.  The plastic Stanley sawhorses…junk.  We will be replacing them this week.

Photo Oct 16, 1 40 34 PM.jpg

All posts and beams have been set and the work site cleaned up.  

Pro tip:  A clean job site is a safe job site.  Always clean up as you go and at the end of each work day.

All in all it took myself and my wife about 5 hours to complete the entire post/beam construction.  This coming weekend we will frame up the floor joists.  

Pier Pour

The past weekend played host to a major event at LKW.  We broke ground and poured the piers for the new shop.  We ended up pouring 12 – 12″x30″ concrete piers to act as the foundation.  The building, as said before, will be 20’x24′ so this will be structurally adequate.  We did three rows of 4 piers and will begin setting the 6×6 posts and flooring this coming weekend.  Exciting times.

Photo Oct 08, 5 14 31 PM.jpg

Running the earth auger we rented at the local equipment rental.  Quick tip:  if your soil is rocky like ours, you will still need a spud bar and post hole diggers to clean the hole out.  This hydraulic auger was hung up several times on each hole but it was nothing the steel spud bar couldn’t handle.

Photo Oct 09, 2 09 30 PM.jpg

The better half of LKW hand mixing the Quikrete for the piers.  It took nearly 30 – 80lb bags to get the job done.

Photo Oct 09, 3 38 29 PM.jpg

All the piers have been poured, rebar set for the posts, and batter boards await.  Good times.  

Pro tip: It is of utmost importance to have your batter boards set and lines level and square.  We used a line level and the 3-4-5 rule to verify our markers.  The 3-4-5 rule is this: measure from where the lines meet out one leg of the string 3′ and mark (use a piece of masking tape to mark the string – you can see the blue tape in the photo above), then measure out the other leg of the other string from the same corner 4′ and mark (other piece of blue tape), next measure diagonally between these two string markings (from edge of tape to edge of tape).  Your measurement should be 5′.  If it isn’t then your strings aren’t square and need to be moved.